
New roof in Irmo · Itemized estimate · 15 minutes from our shop
Roof Replacement in Irmo, SC
Architectural shingle and standing seam replacements for Irmo split-levels, two-story colonials and HOA townhomes, with the permit, the tear-off and the cleanup handled by our own crew.
How much does a new roof cost in Irmo?
Quick answer
Roof replacement in Irmo generally runs $11,000–$21,000 in 2026 for architectural shingles. Across the Midlands, shingle roofs run about $500–$700 per square installed and standing seam metal $1,300–$1,800 per square. These are estimates, not a quote; your price is confirmed in writing after a free inspection.
Irmo homes are mostly moderate in size, so the square count rarely pushes a price to the top of that range. The shape of the roof does. Our estimate breaks out every line so you can see what is driving your number, and the same rates are published in our 2026 cost guide.
What moves the price on an Irmo roof
- Split-level geometry. Two roof planes at different heights joined by a wall means a long run of step flashing, a wall-to-roof transition and a kick-out at the bottom. That detail work adds labor that a simple ranch of the same size does not need.
- Pitch and height. Steeper two-story colonials need roof jacks and slower, safer production.
- Layers. A house built in the 1980s may still have an older layer under the current shingles. Two layers mean more tear-off labor and more disposal.
- Decking. We replace only the sheets that are actually bad, at $95–$150 per sheet, and we photograph them before they are covered.
- Ventilation. Correcting attic airflow, usually ridge vent plus the intake it needs, typically adds $400–$900.
- Gutters at the same time. Under Irmo's pines most gutters have overflowed for years. Seamless aluminum averages about $11 per foot installed and micro-mesh guards about $7 per foot, and doing both with the roof saves a second trip.
Shingles or standing seam for an Irmo home?
Most Irmo houses get architectural shingles, and they are the right call for a two-story or split-level in a subdivision. Standing seam metal earns its cost on low-slope porches, bay roofs and outbuildings, and it is a common request out in Ballentine and the Dutch Fork, where lots are bigger and barns, shops and wraparound porches are more common. Some homeowners do both: shingles on the main house and metal on the porch.
Homes near the Lake Murray Dam on Irmo's northwest edge, built 1927–1930 at Dreher Shoals, see more wind coming off open water. On those roofs we pay extra attention to uplift at rakes and hips and use a six-nail pattern. Compare the two materials side by side on our metal vs. shingle comparison, see our metal roofing page, or try colors on your own house with the roof visualizer.
Ventilation on split-level roofs
A replacement is the cheapest time to fix attic airflow, and split-levels are where it most often goes wrong. Their ridges are short, so a ridge vent alone cannot move enough air, and many were built with little or no soffit intake. Exhaust without intake just pulls conditioned air out of the house or draws rain in. We measure the attic, work out the net free area it needs, add intake at the eaves first, and then size the exhaust. Sometimes that means ridge vent plus low-profile vents on the upper plane.
What replacement day looks like in an Irmo neighborhood
Most Midlands homes are torn off and finished in one to two days, and we dry the roof in completely every day. Before the tear-off starts we tarp shrubs and beds and protect the driveway. The old roof comes off one section at a time, decking gets checked and replaced where needed, and new underlayment, flashing and shingles go on. At the end we pick up debris by hand and run magnets over the driveway and yard for nails.
If your home is in an HOA, which is common around Harbison, the association may need to approve the shingle color before work starts. We supply the product sheet and color samples for your application, and we schedule around the approval.
Permits and inspection for an Irmo re-roof
A full replacement inside town limits starts with a zoning permit from the Town of Irmo. The building permit and the inspection then go through CC&I Services, the town's third-party building department, whether the house is on the Lexington County or the Richland County side. Irmo-addressed homes outside the town limits are permitted by Lexington County or Richland County instead. We confirm which applies before we schedule, pull the permit and book the inspection, and the permit is a line item on your estimate.
When insurance pays for the new roof
If wind or a falling limb damaged enough of the roof, your homeowner policy may pay for the replacement minus your deductible. Our estimators write the scope in Xactimate, meet the adjuster on the roof and file supplements when the first estimate misses items. If the roof is simply old, we will tell you that instead. See how storm claims work.
Financing and warranty
Payment options are on our financing page, and the coverage choices for a new roof are explained on our warranty page. For the citywide picture of Irmo roofing, see Roofers in Irmo, SC, and our Columbia roof replacement page covers older in-town homes across the river.
Talk to a person instead
Our office on Leaphart Road answers the phone Monday–Friday, 8am–5pm. After hours, the on-call estimator handles emergency tarping.
What happens next
- We call you back within one business hour.
- A real roofer walks the roof — 19 checkpoints, photos of every slope.
- You get a written estimate and, if it's storm damage, a claim-ready damage report.
- You decide. No high-pressure close, no same-day-only pricing.
Irmo roof replacement questions
How long does an Irmo roof replacement take?
Most Midlands homes are torn off and finished in one to two days. Larger or more complex roofs can take longer, and weather can push the start date. You get the schedule with your estimate.
Do I need HOA approval in Harbison?
If your home is in an HOA, the association usually has to approve the shingle color or product before work starts. We give you the product data and color samples for the application and schedule after it is approved.
Will you replace the gutters too?
We can, and under Irmo's pines it often makes sense. We form seamless gutters on site and can add micro-mesh guards. Doing gutters with the roof avoids a second visit, and we price them separately so you can decide.
Should I repair or replace my Irmo roof?
Repair when the damage is isolated and the rest of the roof is sound. Replace when granule loss covers whole slopes, there are several active leaks, the decking is soft in more than one bay, or the repair would cost more than about 30% of a new roof.
4.9 ★ · 460 Google reviews
Reviews from Irmo and nearby
Real reviews mention our crew by name. That is what happens when the same local people show up on every job.
★★★★★
“We had water staining in the hallway after a July thunderstorm. Our repair tech found the actual problem — a failed pipe boot, not the shingles — and fixed it for a couple hundred dollars instead of selling us a roof. That honesty is why we've since had them do our gutters.”
No-pressure next step
Get a written replacement estimate for your Irmo home
Free 19-point inspection, photo report the same day, and a written Xactimate-grade estimate you can hand to your insurance adjuster.
Why homeowners call us first
- Our estimators handle insurance claims every day — we write in Xactimate, the same platform your carrier uses, and can walk you through the process every step of the way.
- 4.9 ★ from 460 Google reviews.
- We meet your adjuster on the roof, file supplements, and handle the paperwork.
- Local Midlands crews — never subcontracted storm chasers.
